Factory direct RO, purified water, EDI and pretreatment equipment for overseas project buyers

Boiler Feed Pretreatment System

Large flow pretreatment planning before RO, boiler feed water or central industrial water treatment.

Boiler and large flow

Start from the project condition.

Large flow projects fail early when hardness, turbidity, iron or suspended solids are ignored. The front-end process must protect membranes and downstream equipment.

  • Water analysis report
  • Hardness, iron and turbidity
  • Downstream RO or boiler demand
  • Peak flow and continuous flow
Check required data
Boiler Feed Pretreatment System equipment planning
Send water report, required flow rate, downstream equipment and site connection points.

Recommended equipment route.

Use the solution page to explain the project, then compare the equipment route and models before final quotation.

View Pretreatment Systems